Thank You For Contacting SCPC
Get a Professional Consultants Certificate quote - PCC also known as an Architects certificate. 40 years’ experience, and a member of the Chartered Association of Building Engineers.
957
page-template-default,page,page-id-957,bridge-core-3.0.2,qodef-qi--no-touch,qi-addons-for-elementor-1.6.9,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-28.8,qode-theme-bridge,wpb-js-composer js-comp-ver-6.9.0,vc_responsive,elementor-default,elementor-kit-8
 

Thank You For Contacting SCPC

Thank You for contacting SCPC.

We will be in touch shortly.

Quotes

For Professional Consultant Certificate Quotes the first step will be to gather information about your project.

You can get this process started now by completing as much of the form below as possible.

Many thanks.

  • 1) Name and Address of Proposer
  • 2) Description of Project
  • 3) Duration of Works
  • 4) Parties to the Contract
  • a) Main Contractor
  • b) Architect
  • c) Structural / Civil Engineer
  • d) Building Control Body
    I confirm that all details on this form are correct.
  • This field is for validation purposes and should be left unchanged.

The purpose of this document is to provide an overview of the Development in order for us to provide an initial assessment of the risk and those involved, so please ensure this document is full completed.

Please provide as many of the following as possible, available at the time of submission.

  • Full Plans, Drawings and Elevations (both existing and proposed) 
  • GANTT Chart / Schedule of Works
  • Schedule of Accommodation including Floor Area Splits
  • Design and Access Statement 
  • Ground Investigation Report / GeoTechnical Report / GeoEnvironmental Report
  • RIBA Stage 2, 3 or 4 Design Report (or another document type which details the Technical Design specification)
  • Full Breakdown of the Contract Value and / or Bill of Quants 
  • Existing Structure / Condition Report (required for all risks with a retained structure)

Please note that additional information/documentation maybe requested, dependant on the nature of the project.